F6

Surface of high importance. Alignment, apperance very important

F5 

Structural surfaces of importance. Frequent close scrutiny

F4

Structural surfaces of importance observed frequently

F3

Exposed surfaces not subjected to close scrutiny

F2

Keying surfaces for plaster and other thick coatings

F1

Roughness permitted: fill tieholes, defects. Colour Variation permitted.  

Architectural or feature panels. High velocity water channels. Walls, panels, columns, beams, piers, soffits, parapets, railings, offices, foyers, public areas Walls, panels, columns in secondary areas (e.d. basements, car parks)  Building and engineering structures viewed from afar Interior and exterior surfaces to be coated Concealed surfaces. Foundations, lined walls, upstream dam surfaces 
Surface plane variation Sample reference panels required R R R      
Abrupt (mm) 1     3 3 4 6 6  
Gradual (mm) 4 6 6 6 6  
Colour Discolouration P P P       
Contamination P P P      
Dusting P P P P P  
Retardation P P P      
Efflorescence P P P P P  
Acceptable shade range* * * *      
Physical Irregularities Blowhole Limits 2 3 4 5 7 7
Formwork Deflection 2mm

1/360

3mm

1/270

3mm

1/270

     
Grout loss/scour E P P P    
Form tie A A A      
Sheet location A A A      
Scabbling P P P P    
Chipping P P P P    
Spalling P P P P    
Surface dressings Filling composition S A S      
Method A A A A    
Action A          
R=Required  S = Specifier to stipulate  P=Precautions to minimise effects  E=Prevent occurance  A=Appoval required

*If specified shade range required, the finish must be designated with X suffix


Table 1. Summary of specification requirements for formed finishes.